Taking too long? Close loading screen.
SERVICE CLIENT : (+216) 31 346 346  Qui Sommes Nous

Fethi Chakroun 116 views

Fethi Chakroun

The Candidate's contact information is private

Informations Générales

  • Language Arabe/Francais/anglais
  • diplôme le plus élevé Basic Safety Induction and Emergency Training done
  • Années d'expérience 30 ans
  • Catégorie emploi Autres, Ingénierie
  • Poste souhaité Consultant /Formateur
  • Lieu emploi Ariana, Ben Arous
  • E-mail [email protected]

Expérience(s) Professionnelle

1983-1992
SEREPT – ELF-Aquitaine Tunisia – (TUNISIA)Electrical Maintenance Supervisor

Project Description : The Ashtart field is the second largest oil fieldrnin Tunisia, and maintaining a high level of production is important to therncountry's economy. The Ashtart oil field is located in the Gulf of Gabes, 50rnmiles (81 Km] southeast of Sfax, Tunisia (Fig. 1). Water depths are about 223rnft [70 m] in the area of the field Offshore Platforms,Oil Production ASHTARTrnField

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

 

rnrn

Ø  Lead Supervisor on the project of fieldrnextension and development Ashtart platforms commissioning and start-up (3rnyears).

rnrn

 

rnrn

Ø  Senior Electrical & Instrument on thernmaintenance department for Ashtart Platforms.

rnrn

Ø  Responsible for installation,rnCommissioning and Maintenance of different Transformers, Distribution systemsrnof HV & LV switchgears.  

rnrn

Ø  Responsible for the day today activitiesrnof all Electrical & instrument equipments of the platforms. It include 5.5rnKV transformers, LV switchgears, motors, Variable frequency drives( VFD)test,rnHVAC units, Fire detection system, Lighting system, all kind of Instrumentsrnsuch as pressure, flow, temperature, level, control valves calibrations,rnsmart-wire & Profibus system tests. All interlock testing of the entirernproject etc…

rnrn

Ø  Operation and Maintenance system schedulesrnrepairs, routine maintenance tasks share-out, troubleshooting, CMMS schedulesrnpreventive maintenance and tracks repairs orders spare parts for criticalrnpieces of equipment.


1992-1994
Maintenance & Services Company, Sfax Electrical and Instrumentation Site Representative

Project Description:  Sub Contractor for the following Companies:

rnrn

Ø  BRITISH GAS LIMITED – Gremda Oil Fieldrnexpansion: Supervision of electrical and instrumental works. Hook up

rnrn

 

rnrn

Ø  ESSO STANDARD – La Goullette: Supervisorrnfor the general renovation, project electrical and instrumentation systems forrnfuel storage tanks & loading stations.

rnrn

 

rnrn

Ø  BRITISH GAS LIMITED – Development of 2 oilrnfields on shore & off shore (Rhemoura field and Cercina Platforms):rnSuperintendent for the electrical and instrumental works on the oil treatmentrncenter.

rnrn

Activitiesrninvolved:

rnrn

 

rnrn

ü  Study AFC drawings, Material Requisitions,rnMaterial Take-off, Specifications to ensure adequacy and high lightrndiscrepancy, if any.

rnrn

ü  Provide Input for Manpower resources,rnestimation & preparation of Construction/ Pre-commissioning Schedule.

rnrn

ü  Prepare requisition for constructionrnmaterials. Organize and Mobilize Manpower, Materials and Construction Equipmentrnto site.

rnrn

ü  Preparation of construction andrnpre-commissioning procedures.

rnrn

 

rnrn

ü  Inspect/check all project materialsrnreceived are in accordance with project spec/P.O. Prepare non-conformancernreport for deviations and inform PMT.

rnrn

 

rnrn

ü  Delegate installation works tornsubordinates, prepare daily progress reports, and assess the daily progress inrnterms of efficiency/Productivity and take corrective actions.

rnrn

 

rnrn

ü  Ensure that construction activities arerncarried out safely, meet the project safety and quality standards and arerncompleted as scheduled. Mark-up of As-Built drawings on daily basis.

rnrn

 

rnrn

ü  Provide input to Project Management Teamrnfor potential additional works/change order request during construction stage.

rnrn

 

rnrn

ü  Ensure that pre-commissioning activitiesrn(field calibration, testing) begin in conjunction with construction.rnThereafter, organize loop testing with specialized pre-commissioning team tornmeet commissioning and start-up schedules.


1994-1996
BRITISH GAS LIMITED – (TUNISIA limited)Electrical Maintenance advisor

Project DescriptionHannibal Gas Treatment Plant in Sfax (TUNISIA). NEW GAS PROCESSING PLANT

rnrn

The field is part of a rich gas, condensate andrnassociated oil rim within the nummulitic carbonate El Garia reservoir horizon.rnThe onshore gas plant is a gas conditioning train encompassing gas separation,rnmercury removal, gas dehydration using molecular sieve, H2S/CO2 removal, exportrngas compression, condensate stabilisation, condensate storage and exportrnsystems. The plant functions will include recycle gas compression.

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

 

rnrn

Ø  Power generation for the plant, safernKeeping and maintenance of two gas turbines (General Electric LM2500 – 24 MW).

rnrn

 

rnrnElectrical powerrngeneration feeders, MCC distribution and isolation of 11 and 30 kV networks. 


1996-1999
ELF CONGO – Guinea Gulf; AFRICA.Electrical & Instrument Maintenance Supervisor

Project Description:rnYANGA, SENDJI Platforms, and Offshore Oil Production Fields (45 000bbl/D). Now isTOTAL Exploration & ProductionrnCONGO (TEPC) – SENDJI/YANGA Project- Offshore.

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

 

rnrn

Ø  Management 3Teams, 16Technicians,rnoperation and Maintenance system schedules repairs, routine maintenance tasksrnshare-out, troubleshooting, CMMS schedules preventive maintenance and tracksrnrepairs orders spare parts for critical pieces of equipment.

rnrn

 

rnrn

Ø  Technical support for the power generationrn(Power production), electrical networks distribution, 3 turbines GeneralrnElectric Type Ms 3002 / 12 MW each MarK V), electric networks 5.5/30 kV tornenergize principal electrical grids and satellite platforms.

rnrn

 

rnrn

Ø   Monitoringrnrequirements of Five NP reciprocating  compressors  drive by electrical motors and used for gasrnlift injection, both for the mechanical integrity and performance of thernmachine  , carry out key performance and designrncalculations using a computer. Terminology used to describe compressor performancerncapacity and to identify the main components of the compressor.

rnrn

 

rnrn

Ø  Responsible for the high voltage isolationrnand safekeeping. of electrical installations from 230VAC up to 30KVrnswitchboards.

rnrn

 


1999-2000
Nuovo- Pignone - Florence – ITALYOfficial Lead Engineer of Nuovo Pignone (GE) Representative _Libya

Ø  Responsible for the timely and accuraterncompletion of Commissioning and repair done by NP engineers, Time Tracking,rnSite Visit Reports, Expense Reports and other business related documents. Workrnas part of the service team when required in the area.

rnrn

 

rnrn

Ø  Responsible for managing change withinrntheir discipline and for ensuring impacts of change are quantified andrncommunicated.

rnrn

 

rnrn

Ø  Technical support to Nuovo Pignonerncustomers in the area for: spare parts, modification and repairs (fieldrnservices and maintenance contracts for gas turbines GE, centrifugal andrnreciprocating compressors, pumps, valves etc.) global assistance includingrntroubleshooting and schedules preventive maintenance , tracks repairs ordersrnspare parts for critical pieces of equipment. (Mainly Instrumentation &rnElectrical oriented).


2000-2002
SHELL Petroleum Development Company of NIGERIA (SPDC).Commissioning Lead Engineer E& I, start-up and maintenance

Project Description:rnBelema Gas Project -rnState Rivers - Port Harcourt – NIGERIA.

rnrn

On the Belema Gas Injection Project forrnCommissioning, Start-Up, troubleshooting, initial operation and globalrnmaintenance after start-up, 4 plate-forms (EK1, EK2, ODM & BELEMA)rnAssociate Gas Gathering Facility (all remaining associated gas was flared byrnthe flow station flares system and the principal plate-form BELEMA, designed tornreceive the LP gas where will be mixed with gas prior to export to gas plant atrnSOKO).

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

Ø  Commissioning , startup and maintain 4rnreciprocating Ariel gas compressors drive by Waukesha gas enginesrnand one centrifugal compressor for export. Monitoring requirements of the compressor,rnboth for the mechanical integrity and performance of the machine. Leading strategies employedrnto control capacity of the compressor for various applications and diagnose keyrnfault conditions occurring on the reciprocating compressor.

rnrn

 

rnrn

Ø  Two Solar turbines and all relatedrnequipments. Responsible for the generation and implementation of writtenrnCommissioning Procedures, including Dry and Wet Test documentation and FAT/RFC/RFSU/SAT/Acceptancerntest procedures.

rnrn

 

rnrn

Ø  Responsible of Commissioning EngineerrnE&I include but are not limited to the following: testing andrntroubleshooting all systems hardware including mechanical, electrical andrninstrumentation. Must implement design modifications in agreement with the ProjectrnEngineering Team and Change Control procedures to participant in the projectrnrisk assessments and project kick off meetings.

rnrn

 

rnrn

Ø  Take the lead in following establishrntechnical procedures for commissioning & start-up, including attendance andrninvolvement at Tool Box Talks and Safety Meetings.


2002-2006
TOTAL E&P – CAMEROUN Rio Del Rey -Douala Electrical Maintenance Supervisor & commissioning.

Project Description: The "Great EKOUNDU" fields are locatedrnoffshore Cameroon in the Rio Del Rey, an area which comprises the eastern partrnof the Niger delta.rnOffshore platformsrnoil production Fields (60 000bbl/D) – CAMEROUN.

rnrn

 

rnrn

 Activities involved:

rnrn

ü  Responsible person for operating and highrnvoltage switching and safe isolation procedures of HV switchgear up to 15KV.

rnrn

 

rnrn

ü  Responsible for ensuring compliance tornclassification requirements those electrical & instrument equipment,rnvessels, machinery, monitoring system and hull related to the positionrnresponsibility.

rnrn

 

rnrn

ü  Ensures availability of adequate level ofrnstock materials and spares to sustain maintenance operations. Ensures properrnengineering standards are observed in all procurement activities related tornmaintenance materials and spares.

rnrn

 

rnrn

ü  Take the lead in following establishrntechnical procedures for commissioning & start-up, including attendance andrninvolvement at Tool Box Talks and Safety Meetings.

rnrn

 

rnrn

ü  Provide Advanced Troubleshooting servicesrnto Electrical staff on technical problems, with primary focus on Safe PowerrnGeneration and ESP oil lift.

rnrn

 

rnrn

ü  Ensure progress of the discipline isrnregularly recorded / reported and the forecasts of task completion and overallrndiscipline out turn are communicated to the project controls team.

rnrn

 

rnrn

ü  Ensure Facility controls, machinery etc.rnfunctions safely, efficiently, and within budgetary limits, utilizing allocatedrnresources, with the objective of meeting business goals for production whilernminimizing unscheduled equipment down time.


2006-2007
ECUMED /CANDAX –CANADA at TunisiaCommissioning Manager. El Bibane project ZARZIS_Tunisia

ProjectrnDescription:rnThe El Bibane field isrnlocated approximately 18 kN offshore Tunisia in the Gulf of Gabes. Productionrnfrom El Bibane commenced in 1998, with cumulative gross oil production ofrnapproximately 3.9 million barrels to date. Estimated net remaining Proven +rnProbable reserves to Candax are 1.95 MMBbls and 6.99 Bcf of gas.*

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

ü  Provide ECUMED Staff Commissioningrnprocedures, Commissioning and Start-Up Instructions, planning function for SATrnand start-up procedures El bibane CPF center process facility.

rnrn

  Responsible for the generation andrnimplementation of written Commissioning Procedures, including Dry and Wet Testrndocumentation and FAT/SAT/Acceptance test procedures.

rnrn

ü  Manage the data collection and siterninvestigation work for their discipline to allow design basis to be define andrntie-in points to be fully specified.

rnrn

ü  Commissioning and startup two (secondrnhand) reciprocating gas compressors (Cooper) ,Multistage compression,rndrive by gas engines after refurbishment at factory  , this job cover review of Compressor modifications,rn Compressor Components Cylinders, Lube Oil and CoolingrnSystems Frame Oil System, Cylinder Oil System, Compressor Cooling , Pulsation andrnVibration during operation phases.

rnrn Report to project engineering Manager onrnprogress of activities


2007-2011
TOTAL- elf petroleum Nigeria. OML58 Oil field and Gas Plant.Electrical Superintendent (Maintenance and Commissioning Tasks).

ProjectrnDescription: OGBOGU-OML58rnoil fields and gas plant (60.000BBL/D) is also upgrade project on going:rnResponsible for the coordination of the interfaces between the Electrical disciplinesrnand other disciplines on the project both sites.

rnrn

 

rnrn

Activitiesrninvolved:

rnrn

Ø  Responsible for day to day activities of electrical maintenance onrnthe OML58 sites related to: oil field “OBAGUI”, rnGas plant “OBITE” and EGI power plant: Rotating equipment and systemrnpertaining to oil & Gas/Petrochemical plants related to Engineering andrnMaintenance with specific exposure to Gas turbine, centrifugal compressors,rnreciprocating compressors, centrifugal pumps and associated systems/auxiliary.

rnrn

 

rnrn

Ø  Responsible on OML58 fields for the development of the E&Irndiscipline execution plan. Mobilizes and supervises all the internal andrnexternal resources necessary to maintain all equipment in safe runningrnconditions.


2012-2013
SEREPT / OMV – Ashtart Platforms Upgrade Project. TunisiaElectrical Commissioning Leader.

Ø  Electrical Commissioning Leaderrn(Ashtart Brown Field Revamp Project – Tunisia).

rnrn

Preparationrnand the execution of commissioning activities pertaining to project phasesrn(pre-shutdown and shutdown activities), prepare general procedures forrncommissioning and energizing, ensure compliance with project specifications,rncommissioning group procedures and  Oper Comrnprocedures and Specifications.

rnrn

 

rnrn

Project Description:  Is arnrevamping project (Up-grade of the Existing facilities) including De-commissioningrnactivities and tie-ins with Existing facilities. The Main Equipment torninstalled & commissioned is the Following:

rnrn

Ø  2 Turbo Generators (Solar Turbine Taurus 70). It comprisesrna HYUNDAI synchronous generator (8000 KVA, 6400 kW, 0.80 PF, 1500 RPM, 5500 V)rndriven by a single shaft SOLAR TAURUS 70 dual fuel Turbine of 7.5 MW power

rnrn

Ø  1 Turbo compressor For Gas Lift expansion (ThermodynrnCentrifugal Compressor drive by Solar Turbine Taurus 70 - 8 MW )

rnrn

Ø  Fuel Gas Screw Booster Compressor & TreatmentrnUnit Process Condensate Stabilization Unit

rnrn

Ø  2 new Electrical / Control Room Sub-sea Powerrncables

rnrn

Ø  HV & LV Switch Boards

rnrn

Ø  HV & LV Transformers

rnrn

Ø  UPS’s and SCADA (Schneider SEEFOX) New ControlrnSystem Delta V.

rnrn

 

rnrn

Activitiesrninvolved

rnrn

 

rnrn

Ø  Perform the duties and responsibilities for allrnareas of work covered under Electrical Engineering for assigned OffshorernEngineering Projects. These include, generators, motors, pumps, UPS’s, VSDs,rnswitchgear, transformers, overhead transmission lines, power system protectionrnand load management systems PDCS. Investigates and devises technical solutionsrnto meet project requirements, prepares discipline input and technicalrndocumentation and supervises technical aspects during the course of projects.

rnrn

 


2014-2015
TOTAL E&P Nigeria Limited_OML102-OFON- Phase2 ProjectElectrical Commissioning Lead Engineer.

The OFON II (Mega Project) Installationrnconsisting of four new platforms, two production platforms, a processingrnplatform and an accommodation platform most of the development is dedicated tornrecovering natural gas, which will be compressed and shipped. OFON Phase 2 will unlock the field’s undeveloped reserves to increasernproduction to 90,000 barrels of oil equivalent per day from 30,000 barrels, byrninstalling 5 new platforms: 3 drilling platforms, a processing platform and anrnaccommodation platform for 124 people.

rnrn

Activities involved:

rnrn

Performrnthe duties and responsibilities for all areas of work covered under ElectricalrnEngineering for assigned Offshore Engineering Projects OFON-OFP2. Theserninclude, Turbines RR; GE generators,  Reciprocating gas compressors LP , centrifugalrnMP/HP compressors, HV motors, pumps, UPS’s, VSDs, switchgear, transformers,rnoverhead transmission lines, , power system protection and load managementrnsystems PDCS.

rnrn

 

rnrn

BasicrnFunction and Scope:

rnrn

 

rnrn

Ø  Ensuring all tasks are achieved within allocated project planrnmilestones, or time lines given Comments, reviews and approves all FEEDrndeliverables related to Commissioning torndefine content of electrical Commissioning Procedures using ICAPS softwarernsystems.

rnrn

 

rnrn

Ø  Investigates and devises technical solutions to meet projectrnrequirements, prepares discipline input and technical documentation andrnsupervises technical aspects during the course of projects.

rnrn

 

rnrn

Ø  Start-up phase; Support proactive and reactivernof rotating equipment, associated systems and mechanical equipment as perrnManagement Process. Review all the rotating equipment and associated systemsrnand spares for onshore plant and offshore production facilities.

rnrn

 

rnrn

Ø  Monitor,rncontrol and take part in directing the quality of Commissioning activitiesrncarried out by E&I teams.
rn•Develop, review and update E&I commissioning job plans, whilernsimultaneously ensuring that these associated activities are professionallyrncarried out in the field.
rn•Represent and support the E&I teams in technical discussion andrncommunications with Vendors and equipment suppliers.

rnrn

 

rnrn

Ø  Startup/ stop sequences : analysis minimumrnrequirements to safely start and stop the unit especially for turbines  and gas compressors and Special sequences tornmeet process requirements, Main Parameters During Compressor Operation, Data acquisition systemsrn, analysis and Run-out and rod-drop.

rnrn

 

rnrn

Ø  Complete commissioning of 12MW,MP/HPrncentrifugal compressors  drive byrnelectrical motors using VFD • involved in the operation of centrifugal compressorsrnand identify the main process variables which affect compressor operations thernkey issues associated with the use of the API 618 in the specification of gas compressors.

rnrn

 


2016-2017
STRATHOM GROUP AlgeriaCommissioning Superintendent (E&I).

Scopernmethods preparation:

rnrn

Organize,rnplan, and manage the execution of the PC&C activities (as required byrncontract) with respect to TECHNIP, Client rules and secure availability of thernadequate resources In order to reach the Mechanical Completion step andrnensure that Units are constructed/precommissioned and tested according design,rndrawings and specifications

rnrn

•Realisernthe Commissioning activities and provide the Handover of documentations

rnrn

Review the revamp Construction phasesrn(E/I) Contract and identify all the method statements required for the Projectrnin relation to the Testing and Commissioning Works. Provide Assistance andrndirective in the Preparation of requisitions, technical specifications forrnmaterials, equipment and consumable required to perform the commissioning scopernof work related installation to :

rnrn

 

rnrn

·      HV/MV/LVrnnetwork systems. 
rn• Lighting & Earthing systems. 
rn• Power system Protections. 
rn• AC/DC UPS systems. 
rn• Cathodic Protection systems 
rn• Process & Control systems, 
rn• Fire & Gas systems. 
rn• BMS/CCTV/PA-VA systems. 
rn• ACS & HVAC control systems 
rn• FAT/SAT Testing & Pre-Commissioning/Commissioning works. 

rnrn

Issue confirmation that the Testing andrnCommissioning Works will completed in accordance with the Construction Contractrnand thereby demonstrate the functionality of each equipment and/or system.

rnrn

 


Senior interim

Parce que la vie commence a 50 ans Senior interim créée en 2017 met a votre disposition les meilleures opportunités Parce qu’on a toujours besoin de quelqu’un sur qui on peut compter parce qu’on a toujours besoin de votre expertise

Contactez Nous

Senior Interim Inc.
Tunis : Immeuble Louati1 Avenue de la Lire Bloc B, Jardin du lac, Les berges du lac, 1053
Sfax : Avenue Majida Boulila, Immeuble Ezzaphir, Etage 1, Bureau N°15 , Sfax 3027
[email protected]

MOYENS DE PAIEMENT

paiementheader




Nous offrons le canal optimal pour la transmission du savoir entre les Seniors expérimentés et les sociétés ambitieuses.

[email protected]
(+216) 31 346 346
close-link